BidBondCommitmentLetterInd | Indicates whether or not a Bid bond commitment Letter has been provided. |
BidDt | The date the bid bond will be submitted to the obligee. |
BondSubcontractorInfo | This aggregate contains information about a subcontractor associated with a bond. |
ContractAmt | Total contract amount. |
ContractBidResults | This aggregate collects information on the results of contractor bids. |
ContractDt | The date of the contract itself. |
ContractorsProjectNumber | The identifier assigned to the project by the contractor. |
ContractSolicitationNumber | The identifier assigned to the contract guaranteed by the bond to the Obligee. |
ContractStartDt | The date the work covered by the contract guaranteed by the bond is scheduled to start. |
ContractTerm | This indicates the period for the contract, policy, binder, etc. |
DesignBuildContractInd | Indicates whether or not the contract is a design/build obligation. |
EngineersEstimateAmt | The engineer's estimate of the job cost. |
EstimatedBidAmt | The proposed price for the contractor to complete the job. |
EstimatedCompletionDt | The date by which substantial completion of the work covered by the contract will be completed. |
JobBreakdownEquipmentPct | The estimated Percentage of the job attributable to equipment costs. |
JobBreakdownLaborPct | The estimated Percentage of the job attributable to labor costs. |
JobBreakdownMaterialPct | The estimated percentage of the job attributable to material cost. |
JobBreakdownOverheadPct | The estimated Percentage of the job attributable to overhead costs. |
JobBreakdownProfitPct | The estimated Percentage of the job attributable to profit costs. |
JobBreakdownSubContractedPct | The estimated Percentage of the job attributable to sub-contracts. |
LegalProjectName | The full legal name of the project. |
LiquidatedDamagesAmt | The monetary amount the contractor must pay the obligee each day that the contract runs over the completion date due to unauthorized delays. |
LiquidatedDamagesDesc | The description of the penalties owed to the obligee by the contractor when the contract runs over the completion date, due to unauthorized delays. |
LiquidatedDamagesFrequencyCd | The period of time associated with the Liquidated Damages Amount. |
Location | The Location aggregate defines a geographic location. |
MaintenanceTerm | The term of the maintenance. |
MiscParty | This aggregate provides information about a miscellaneous individual or organization. |
NewContractedWorkAmt | The amount of work contracted for by the contractor since the Work On Hand Date referred to above. |
NumOutstandingBids | The total number of pending (non-awarded) bids for this principal. |
OtherOutstandingBidsAmt | The total of bids submitted by the contractor on which no contract award has been made excluding those on which the contractor is the apparent low bidder. |
OutstandingBidsAmt | The accumulated contract price of all pending bids for this principal. |
OutstandingLowBidsAmt | The total accumulated liability of all outstanding bids submitted by the contractor on which no contract award has been made and on which the contractor is the apparent low bidder. |
OwnersEstimateAmt | The estimate of the job cost. |
PaymentScheduleCd | A code indicating how often the obligee pays the contractor. This element uses the Frequency code list. |
PotentialWorkProgramAmt | The amount of work considered the maximum for which the contractor could be committed if awarded contracts under all outstanding bids and if calculated in accordance with the Work On Hand Basis. |
ProjectDesc | The description of the project. |
RetainageDetailsDesc | Description of the retainage percent. |
RetainagePct | Percentage of each billing withheld until the contract is fully completed. |
RunOffAllowanceAmt | The amount of work put in place since the Work On Hand Date reported above for which the contractor is to be given credit in the determination of the Potential Work Program Amount. |
SeparateMaintenanceBondAmt | The amount of the separate maintenance bond. |
SeparateMaintenanceBondInd | Indicates if a separate maintenance bond is required. |
SeparateMaintenanceTerm | The period of time associated with the Separate Maintenance Term. |
TimeBid | The time the bid bond will be submitted to the obligee. |
WorkOnHandAmt | The amount of work the contractor is committed to as calculated in accordance with the Work On Hand Basis identified in the Work On Hand Basis Code. |
WorkOnHandBasisCd | A code identifying the basis used for calculating the Work On Hand. This element uses the SuretyTermsType code list. |
WorkOnHandReportDt | The date of the calculation of Work On Hand Amount. |
WorkTypeSubContractedDesc | Description of the type of work being sublet to subcontractors. |